DC Consulting is aware of six BOT Projects (5 waste-water, 1 water supply) and 3 BT or JV waste-water projects.

Please contact us if interested in further details.

Just a note of caution from DC Consulting regarding BOT and JV in Environmental projects:

Although Build-Operate-Transfer (BOT) is common in other parts of the world, it is still a relatively new concept in China. BOT methods for financing environmental projects are being implemented in order to move projects into the private sector.

Many foreign companies find it hard to evaluate the profits of the environmental projects in China due to the typically long investment and recovery period. Companies are also rightly cautious about the lack of clear rules stipulating fee-charging standards. The Chinese government still needs to promulgate better laws that clearly address the needs and issues of BOT projects in China to make this type of financing a more profitable and thus attractive option.

DC Consulting, President
Dayton J. Carpenter, Esq.

Sewage Treatment Project

Scope: Upgrade facilities and technologies of all sewage treatment plants

Population- 160,000
Industrial output 8 million is preparing to treat its sewage to improve the urban environment.

Specifications:

discharge all the urban sewage into Shanxiajin Station through
pump stations, and the. Discharge the treated waters into Huangniujiao.


Company background: State-Owned Enterprise
egistered capital of US$ 1.2 million.

Economics: Income generated from discharge/treatment fees
Current rates: RMB 0.2/WT for domestic sewage
RMB 0.3/WT for industrial sewage

After Upgrades: RMB 0.4/WT for domestic sewage
RMB 0.6/WT for industrial sewage

Contact DC Consultants for additional information.

Sewage Treatment Project

Summary: Develop municipal waste water treatment plant to treat 80,000 m3/day later to increase to 140,000 m3/day by 2020

Investment US$11.09 million
Type: FFI, Loan

Contact DC Consultants for additional information.


Sewage Treatment Project

Summary: Develop municipal waste water treatment plant to treat 80,000 m3/day later to increase to 140,000 m3/day by 2020

Investment US$11.09 million
Type: FFI, Loan

Contact DC Consultants for additional information.

Industrial Park Wastewater Treatment Plant

Summary: Develop wastewater treatment facility to treat waster water in a pharmaceutical industrial park. The plant needs a daily treatment capacity of 50,000 metric tons. Project also needs an elevated pump station and pipe system.
According to the project manager maybe a possibility of using US technology although most of the basic civil engineering and materials will be purchased locally.

Investment US$10.6 million
Funding has been secured through investors in Hong Kong and Shenzen
Project has been approved by the government

Contact DC Consultants for additional information.


Sewage Treatment Facilities

Cooperation: Joint Venture
Total Investment Amount: US $36 million (domestic 12 million, loan 6 million, FI 17 million)
Sewage collection covers an area of 25.45 Km2 of two cities
Pipe duct 39.2km for stopping sewage,
Reconstruction of the existing drainage pipe 12km
construct 2 pump station lifts of 50,000 tons/day
construct two sewage treatment plants with capacity of 50,000 tons/day
Income: from sewage discharge fees
Proposal and feasibility research report have been approved of the project

Contact DC Consultants for additional information.


Water Pollution Control in the Minjiang River Basin

The Minjiang River is one of the major and most important tributaries of the Yangtze River in the Sichuan Province in terms of social and economic development. The major cities located in the river basin are Chengdu, Leshan, Yaan, Mishan and Yibin.

Due the fast past industrialization associated with economic development the wastewater and solid wastes discharged, primarily organic, including BOD, COD, SS, NH3-N, phosphorus, have had a significant impact on the water quality of the Minjiang River. Urban wastewater and solid waste discharges are responsible for up to 56% of the total pollution.

The Tenth Five-year Plan (2001- 2005) of Sichuan Environmental Protection states that domestic wastewater discharged from urban areas near the Mingjiang River must be limited to 658.76 million t/year and COD discharges must be reduced 67.11 million t/year by the end of year 2005 by setting up wastewater treatment (USD 112.52 million) and solid disposal facilities (USD22.68 million) along the Minjiang River.

Sichuan Minjiang River Basin Water Pollution Control Projects
For more information, contact: Ling Chen, Commercial Assistant American Consulate General, Chengdu, Tel: 86 28 558-3992 ext. 223, Fax: 86 28 558-9221

Wastewater Treatment Plant(WTP) Capacity Investment (USD)

1. Chengdu Pixian County WTP 80,000 t/d 11.84 Mi Loan
2. WTP of Chengdu 100,000 t/d 18 Mi Loan
3. Chengdu Longquan District WTP 40,000 t/d 7.63 Mi JV
4 Yaan Municipal WTP 50,000 t/d 6.02 Mi JV
5.Leshan Municipal WTP (phase 1) 100,000 t/d 20 Mi Loan
6. Meishan Municipal WTP 80,000 t/d 14.63 Mi Loan/JV
7. Emeishan Municipal WTP 50,000 t/d 6.5 Mi JV
8. Yibin Municipal WTP 100,000 t/d 15.9 Mi Loan/JV
9. Panzhihuan Municipal WTP 70,000 t/d 12 Mi JV

Solid Waste Treatment Plant (SWTP )
1. Yaan Municipal SWTP 150 t/d 2.5 Mi JV
2. Santai Country SWPT 200 t/d 2.5 Mi JV
3. Meishan Municipal SWTP 400 t/d 3.61 Mi JV
4. Emeishan Municipal SWTP 400 t/d 4.73 Mi JV
5. Shunan Zhuhai SWTP 500 t/d 4.34 Mi JV
6. Shehong County SWTP 200 t/d 1.25 Mi Loan/JV
7. Mianyang Municipal SWTP 400 t/d 3.73 Mi JV

Sujiatun District Urban Sewage Treatment Project
Location: Liaoning
Total Investment: 11.62 million USD
Planned treatment capacity of 75,000 tons/day
primary + secondary treatment

Contact: Shenyang Foreign Economic Relations and Trade Commission
Location: Shenyang, Liaoning Province
Tel: (024) 22716230, 22724547
Address: 6/F International Trade Building No.35 the Youth Street Shenyang
Post code: 110014


Fujian Wastewater Treatment Project-BOT


Total Investment: 212 million RMB

Local planners in the Quangang, Fujian a petrochemical industry area are trying to build a new wastewater treatment plant with deep-sea discharge. First phase to treat 50,000 tons sewage per day, reaching 150,000 tons per day when finished. Also included is the construction of a 90.74 km sewage collecting pipe line, and deep sea discharge project. Local reports claim that regulations allow for collection of fees ranging from 0.3--.05 yuan per ton and estimate return on investment in 10 years according to the economic development in this area. Project proposal, feasibility study reports, initial design are finished, and approved by the provincial government. Pipeline and deep sea discharge project are on going.

Contact DC Consultants for additional information.


 

 

 


 