DC Consulting is aware of six BOT Projects (5 waste-water,
1 water supply) and 3 BT or JV waste-water projects.
Please contact us if interested in further details.
Just a note of caution from DC Consulting regarding
BOT and JV in Environmental projects:
Although Build-Operate-Transfer (BOT)
is common in other parts of the world, it is still
a relatively new concept in China. BOT methods for
financing environmental projects are being implemented
in order to move projects into the private sector.
Many foreign companies find it
hard to evaluate the profits of the environmental
projects in China due to the typically long investment
and recovery period. Companies are also rightly
cautious about the lack of clear rules stipulating
fee-charging standards. The Chinese government still
needs to promulgate better laws that clearly address
the needs and issues of BOT projects in China to
make this type of financing a more profitable and
thus attractive option.
DC Consulting, President
Dayton J. Carpenter, Esq.
Sewage Treatment Project
Scope: Upgrade facilities and technologies
of all sewage treatment plants
Population- 160,000
Industrial
output 8 million is preparing to treat its sewage to improve the urban environment.
Specifications:
discharge all the urban sewage
into Shanxiajin Station through
pump stations, and the. Discharge the treated
waters into Huangniujiao.
Company background: State-Owned
Enterprise
egistered capital of US$ 1.2 million.
Economics:
Income generated from discharge/treatment fees
Current rates: RMB 0.2/WT for
domestic sewage
RMB 0.3/WT for industrial sewage
After
Upgrades: RMB 0.4/WT for domestic sewage
RMB 0.6/WT for industrial sewage
Contact
DC Consultants for additional information.
Sewage Treatment
Project
Summary: Develop municipal waste water treatment plant
to treat 80,000 m3/day later to increase to 140,000 m3/day by 2020
Investment
US$11.09 million
Type: FFI, Loan
Contact
DC Consultants for additional information.
Sewage
Treatment Project
Summary: Develop municipal waste water
treatment plant to treat 80,000 m3/day later to increase to 140,000 m3/day by
2020
Investment US$11.09 million
Type: FFI, Loan
Contact
DC Consultants for additional information.
Industrial
Park Wastewater Treatment Plant
Summary: Develop wastewater
treatment facility to treat waster water in a pharmaceutical industrial park.
The plant needs a daily treatment capacity of 50,000 metric tons. Project also
needs an elevated pump station and pipe system.
According to the project manager
maybe a possibility of using US technology although most of the basic civil engineering
and materials will be purchased locally.
Investment US$10.6
million
Funding has been secured through investors in Hong Kong and Shenzen
Project
has been approved by the government
Contact
DC Consultants for additional information.
Sewage
Treatment Facilities
Cooperation: Joint Venture
Total
Investment Amount: US $36 million (domestic 12 million, loan 6 million, FI 17
million)
Sewage collection covers an area of 25.45 Km2 of two cities
Pipe
duct 39.2km for stopping sewage,
Reconstruction of the existing drainage pipe
12km
construct 2 pump station lifts of 50,000 tons/day
construct two sewage
treatment plants with capacity of 50,000 tons/day
Income: from sewage discharge
fees
Proposal and feasibility research report have been approved of the project
Contact
DC Consultants for additional information.
Water
Pollution Control in the Minjiang River Basin
The Minjiang
River is one of the major and most important tributaries of the Yangtze River
in the Sichuan Province in terms of social and economic development. The major
cities located in the river basin are Chengdu, Leshan, Yaan, Mishan and Yibin.
Due the fast past industrialization associated with economic
development the wastewater and solid wastes discharged, primarily organic, including
BOD, COD, SS, NH3-N, phosphorus, have had a significant impact on the water quality
of the Minjiang River. Urban wastewater and solid waste discharges are responsible
for up to 56% of the total pollution.
The Tenth Five-year Plan
(2001- 2005) of Sichuan Environmental Protection states that domestic wastewater
discharged from urban areas near the Mingjiang River must be limited to 658.76
million t/year and COD discharges must be reduced 67.11 million t/year by the
end of year 2005 by setting up wastewater treatment (USD 112.52 million) and solid
disposal facilities (USD22.68 million) along the Minjiang River.
Sichuan
Minjiang River Basin Water Pollution Control Projects
For more information,
contact: Ling Chen, Commercial Assistant American Consulate General, Chengdu,
Tel: 86 28 558-3992 ext. 223, Fax: 86 28 558-9221
Wastewater
Treatment Plant(WTP) Capacity Investment (USD)
1. Chengdu Pixian
County WTP 80,000 t/d 11.84 Mi Loan
2. WTP of Chengdu 100,000 t/d 18 Mi Loan
3.
Chengdu Longquan District WTP 40,000 t/d 7.63 Mi JV
4 Yaan Municipal WTP 50,000
t/d 6.02 Mi JV
5.Leshan Municipal WTP (phase 1) 100,000 t/d 20 Mi Loan
6.
Meishan Municipal WTP 80,000 t/d 14.63 Mi Loan/JV
7. Emeishan Municipal WTP
50,000 t/d 6.5 Mi JV
8. Yibin Municipal WTP 100,000 t/d 15.9 Mi Loan/JV
9.
Panzhihuan Municipal WTP 70,000 t/d 12 Mi JV
Solid Waste Treatment
Plant (SWTP )
1. Yaan Municipal SWTP 150 t/d 2.5 Mi JV
2. Santai Country
SWPT 200 t/d 2.5 Mi JV
3. Meishan Municipal SWTP 400 t/d 3.61 Mi JV
4. Emeishan
Municipal SWTP 400 t/d 4.73 Mi JV
5. Shunan Zhuhai SWTP 500 t/d 4.34 Mi JV
6.
Shehong County SWTP 200 t/d 1.25 Mi Loan/JV
7. Mianyang Municipal SWTP 400
t/d 3.73 Mi JV
Sujiatun District Urban Sewage Treatment Project
Location: Liaoning
Total Investment: 11.62 million USD
Planned treatment
capacity of 75,000 tons/day
primary + secondary treatment
Contact:
Shenyang Foreign Economic Relations and Trade Commission
Location: Shenyang,
Liaoning Province
Tel: (024) 22716230, 22724547
Address: 6/F International
Trade Building No.35 the Youth Street Shenyang
Post code: 110014
Fujian
Wastewater Treatment Project-BOT
Total Investment:
212 million RMB
Local planners in the Quangang, Fujian a petrochemical
industry area are trying to build a new wastewater treatment plant with deep-sea
discharge. First phase to treat 50,000 tons sewage per day, reaching 150,000 tons
per day when finished. Also included is the construction of a 90.74 km sewage
collecting pipe line, and deep sea discharge project. Local reports claim that
regulations allow for collection of fees ranging from 0.3--.05 yuan per ton and
estimate return on investment in 10 years according to the economic development
in this area. Project proposal, feasibility study reports, initial design are
finished, and approved by the provincial government. Pipeline and deep sea discharge
project are on going.
Contact